1. Responsible for wind resource assessment, wind farm macro and micro site selection, anemometer tower site selection and tower erection, anemometry data management and analysis, unit selection, power generation assessment, etc.
2. Responsible for wind farm site selection, feasibility study, technical due diligence, technical proposal, wind resource assessment and other report preparation.
3. Responsible for the overall post-evaluation of wind farms, proposing power generation improvement plans based on the operation of wind turbines, and evaluating the effect of power generation improvement.
4. Participate in pre-project technical research and technical communication, and provide technical support for sales staff.
1. Bachelor degree or above, majoring in fluid mechanics, meteorology, mapping engineering, wind energy and power engineering, 3 years or above working experience in wind power industry.
2. Proficiency in using wind resource software such as wasp, windfarm, windsim, WT and AOTOCAD.
3. Familiar with international electric power industry related policies, regulations, etc., and master wind power related professional and technical theoretical knowledge.
4. Able to adapt to long and short-term business trips abroad.